London conference centre 8 floor W/C refurbishment

This 8 floor conference centre refurbishment project involved the complete replacement of all W/C and showering facilities throughout the entire property, with 2 phases of works requiring completion within 8 weeks.

The scope given included stripping out, removal and replacement of cubicles, sanitaryware, hot water cylinders, suspended ceilings, lighting installations, wiring, floor coverings and all fixtures and fittings.

The very busy Centre had to remain operational during the project so Ergro made sure that noise levels were respected, waste removal was conducted out of hours, and toilet closures were managed in cycles to allow a comfortable amount of facilities to remain useable for building occupants. The client has now been left with a far more attractive and useable set of W/C and showering facilities that are complete with LED lighting and movement sensor technology which is improving the energy efficiency of the property.

Having finished a week early, to the Ergro standard and on budget, the client was impressed at how quickly and smoothly the results have been achieved whilst maintaining such good communication throughout.

Download printable PDF version

The main obstacle encountered was that the offices remained fully occupied during the works with a variety of tenants occupying various areas. In addition to this, a key challenge that Ergro were faced with was a very short window of time to refurbish the W/C facilities serving the conference room facilities with a delay to completion not possible.
Ergro worked effectively to complete on time to a high level of finish. Ergro’s workmanship and quality of works was impressive and I would certainly work with them again.